Portal Clientes    Portal Proveedores     Libro de reclamaciones

PROJECT PORTFOLIO

Cerro Corona 1

Cerro Corona

  • Client: Goldfields La Cima
  • Execution time: 4 months
  • Area: 10 000 m²
  • Solution: Screws and MT 2000 mesh
  • Scope: Scaling and supply and installation of mesh

Toquepala

  • Client: Southern Perú
  • Execution time: 9 months
  • Area: 20 000 m²
  • Solution: Screws and high performance mesh MT 2000 / 6000 / GridPro
  • Scope: Design, supply and installation
toquepala 2
quellaveco 3

Quellaveco

  • Client: Angloamerican
  • Area: 300 000 m² MT 2000
    20 000 m² MT 6000
  • Solution: high-performance mesh and screws
  • Scope: Supply and technical assistance
  • Areas:
    • Land movements in mines
    • Water system
    • Cortadera path
    • Tailings dam and transport
    • Concentrator plant

Chinalco Planta Kingsmill

  • Client: Minera Chinalco
  • Execution time: 3 months
  • Length: 2 km
  • Solution: Mining fence and CercasPro®
  • Scope: Design, supply and installation
Chinalco 4
quellaveco 5

Quellaveco

  • Client: Angloamerican
  • Solution: Metallic MP 152 sewers
  • Length: 137 m
  • Scope: Supply and technical assistance
  • Areas: Earth movement plant

Cerro verde

  • Client: Sociedad Minera Cerro Verde
  • Solution: Metallic MP 152 Sewers
  • Length: 170 m
  • Scope: Supply and technical assistance
  • Area: Concentrator 2
Cerro Verde 6
mina justa 7

Mina Justa

  • Client: Marcobre

  • Solution: Jointless Slabs Combislab (Dramix® 4D Fiber + Electrowelded Mesh)

  • Execution time: 2 meses

  • Zona: Truck Shop

  • Scope: Supply and technical assistance

  • Area: 2700 m²

Antapaccay

  • Client: Compañía Minera Antapaccay
  • Solution: Jointless Slab Combislab (Dramix® 4D Fiber+ Electrowelded Mesh)
  • Execution time: 1 month
  • Zone: Emergency well
  • Scope: Supply and technical assistance
  • Area: 6000 m²
antapaccay 8
Cerro corona 9

Cerro Corona

  • Client: Goldfields La Cima
  • Solution: Dynamic Barriers TSC 1000 KJ – H : 4m
  • Execution time: 5 months
  • Length: 1.1 km
  • Scope: Design, supply and installation

Argentum TK03 Sierra Nevada

  • Client: Panamerican Silver
  • Solution: MSE wall with LandPro® gabions
  • Execution time: 2 months
  • Length: 50 ml
  • Scope: Design, supply and installation
argentum 10
cuajone 11

Cuajone

  • Client: Southern Perú
  • Solution: High resistance mesh, anchor bolts
  • Area: 5,000 m²
  • Scope: Technical proposal, supply

Antamina

  • Client: Antamina
  • Solution: Temporary protection system with posts and mesh
  • Area: 12,000 m²
  • Scope: Technical proposal, supply and installation
antamina 12
13. Las Bambas

Las Bambas

  • Client: Las Bambas
  • Solution: High resistance mesh
  • Area:10,000m²
  • Scope: technical proposal, supply

Iscaycruz

  • Client: Glencore
  • Solution: High resistance mesh
  • Area: 22,100 m²
  • Scope: technical proposal, supply and installation
14.Iscaycruz
15. antamina

Antamina

  • Client: Stracon S.A.
  • Solution: High resistance mesh, anchor bolts, shotcrete
  • Execution time: 22 months
  • Area: 15,000m²
  • Scope: Supply and installation

Cerro Corona

  • Client: Gold Fields
  • Solution: High resistance mesh, anchor bolts
  • Execution time: 8 months
  • Area: 22,000m²
  • Scope: technical proposal, supply and installation
16. cerro corona
17. quellaveco

Quellaveco

  • Client: Angloamerican
  • Solution: High resistance mesh, anchor bolts
  • Execution time: 4 months
  • Area: 5,000m²
  • Scope: supply and installation

Toquepala

  • Client: Southern Perú
  • Solution: High resistance mesh, anchor bolts and land movement
  • Execution time: 2 meses
  • Area: 300m²
  • Scope: supply and installation
18. toquepala

DO HAVE QUESTIONS?

WRITE US